README update to note the 0.7 branch

This commit is contained in:
4bb4 2020-10-04 14:53:29 +02:00
parent a8f91a65a7
commit e0ad0e892e

View file

@ -7,6 +7,7 @@ One can still use it as a dependency directly from Git if desired, for example u
``` ```
implot = { git = "https://github.com/4bb4/implot-rs/", rev = "your_favourite_commit" } implot = { git = "https://github.com/4bb4/implot-rs/", rev = "your_favourite_commit" }
``` ```
This is a work in progress. See the "Status" section below for notes on what is already built.
![demo](demo.png) ![demo](demo.png)
@ -38,7 +39,7 @@ This repo tries to follow the approaches and style used in `imgui-rs` somewhat c
because implot is to be used within imgui programs, and hence keeping the interfaces because implot is to be used within imgui programs, and hence keeping the interfaces
and design philosophies close should make it easier to do that. and design philosophies close should make it easier to do that.
If you spot any design inconsistencies or papercuts, feel free to open an issue. If you spot any design inconsistencies or paper cuts, feel free to open an issue.
## Status ## Status
Currently a work in progress. The author is open to collaboration, if you'd like to Currently a work in progress. The author is open to collaboration, if you'd like to
@ -49,7 +50,11 @@ Once there are actual releases on crates.io, semantic versioning will be followe
At this point, raw bindings are working in implot-sys, and more idiomatic interfaces At this point, raw bindings are working in implot-sys, and more idiomatic interfaces
for plot creation as well a subset of the functionality for plots are implemented. for plot creation as well a subset of the functionality for plots are implemented.
See below for an overview of the progress. The master branch points to roughly implot 0.3, and a checklist of what is already
implemented is shown below. Work is ongoing to move to implot 0.7 in the branch
named `update-to-cimplot-0.7`. The latter branch is buildable, but work on wrapping
the newly explicit contexts is not done yet, which is why it has not been merged into
master yet.
- [x] "BeginPlot" - [x] "BeginPlot"
- [x] Basic hello world - [x] Basic hello world